Category: Underground Construction

Link

Einstein, H.H. (1977). Observational methods in tunnel design and construction. In: Proceedings of the 3rd Annual Conference on D.O.T. Research and Development in Tunneling Technology, Atlanta, Georgia, October 6-7, 1977.

Link

Einstein, H.H., Markow, M.J., and Chew, K. (1977). Assessing the value of exploration for underground gas storage caverns. In: Proceedings of the 1st International Symposium on Storage in Excavated Rock Caverns (Rockstore 77), Stockholm, Sweden, 5–8 September 1977. Also in: International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 16 (4), 83. doi:10.1016/0148-9062(79)91268-3

Link

Einstein, H.H. (1978). Observational tunnel design-construction methods in the U.S. In: Proceedings of Shotcrete for Underground Support III, Engineering Support Conference, At. Anton am Arlberg, Austria, April 16-21, 1978.

Link

Einstein, H.H., and Vick, S.G. (1974). A probabilistic approach to geologic investigation for hard-rock tunnels. In: Proceedings of the 3rd Congress of the International Society for Rock Mechanics, Denver, Colorado, September 1974.

Link

Einstein, H.H., and Vick, S.G. (1974). Geological model for a tunnel cost model. In: Proceedings of the 2nd Rapid Excavation and Tunneling Conference, San Francisco, California, June 24-27, 1974.

Link

Blekke, T.L., Einstein, H.H., and Mason, R.E. (1976). State of the Art Review on Shotcrete: Final Report. U.S. Army Engineer Waterways Experiment Station, Contract Report S-76-4, 119 pages, June 1976. Prepared for Office of Chief of Engineers, U.S. Army, Washington, D.C., under Contract no. DACA 39-74-M-0371 and DACA 39-75-M-0082. UNT Digital Library

Link

Adams, M., Azzouz, A.S., and Einstein, H.H. (1984). Instrumentation and Evaluation of Slurry Wall Construction. Vol. 2. Diaphragm Wall: Case Studies and Application of Finite Element Method. Massachusetts Institute of Technology, Department of Civil Engineering. MIT report R86-07, 504 pages, June 1984. Prepared for Federal Highway Administration, Office of Research & Development, Washington, D.C. Final report No. FHWA/RD-84/054. Grant No. DOT-FH-11-9639. MIT Libraries: 000966996

Link

Schwartz, C.W., Azzouz, A.S., and Einstein, H.H. (1982). Example Cost Of 3‐D FEM for Underground Openings, ASCE Journal of the Geotechnical Engineering Division, 108 (GT9), 1186-1186.

Link

Moavenzadeh, F., Einstein, H.H., Vick, S.G., and Markow, M.J. (1974). Tunnel Cost Model: Professional Papers, 1974. Massachusetts Institute of Technology, Department of Civil Engineering. Number 3 in a series on tunnel construction prepared for Research Applied to National Needs (RANN) Program, National Science Foundation. MIT reports P74-4. Geologic model for a tunnel cost model [Einstein & Vick]. P74-5. Tunnel cost model [Fred Moavenzadeh, et al.]. P75-1. Simulation model for tunnel construction costs [Moavenzadeh & Markow]. P75-3. A probabilistic approach to geologic investigation for hard-rock tunnels [Einstein & Vick]. MIT Libraries: 000019601

Link

Einstein, H.H., Miller, J., and Silva, B. (2009). Experimental and Analytical Research on Fracture Processes in Rock. Massachusetts Institute of Technology, Department of Civil Engineering. Final report no. DOE/GO/16061-1, February 2009. Prepared for USDOE Office of Geothermal Technologies under Contract no. FG36-06GO16061. doi:10.2172/948451