Costa, A.L., da Conceição Cunha, M., Coelho, P.A.L.F., and Einstein, H.H. (2018). Planning for natural hazards: Robust approach for high-speed rail infrastructure. Natural Hazards Review, 19 (1), February 2018. doi:10.1061/(ASCE)NH.1527-6996.0000277
Category: Underground Construction
Link
Einstein, H.H. (1994). Comments and recommendations on design and analysis procedures for structures in argillaceous swelling rock. International Society for Rock Mechanics Commission on Swelling Rock (H.H. Einstein: coordinator). International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 31 (5), 535-546. doi:10.1016/0148-9062(94)90155-4
Link
Kaewunruen, S., Sussman, J.M., and Einstein, H.H. (2015). Strategic framework to achieve carbon-efficient construction and maintenance of railway infrastructure systems. Frontiers in Environmental Science, 3. doi:10.3389/fenvs.2015.00006
Link
Einstein, H.H., Yost, K., and Valentin, A. (2012). Decision Aids for Tunneling Applied to Wellbore Cost and Time Estimation. Final report, Massachusetts Institute of Technology. Prepared for USDOE Office of Energy Efficiency and Renewable Energy, Geothermal Technologies Office under Contract no. EE0002743, Recovery Act – Decision Aids for Geothermal Systems, 2012.
Link
Einstein, H.H., and Vecchiarelli, A. (2014). Further Development and Application of GEOFRAC-FLOW to a Geothermal Reservoir. Final report, Massachusetts Institute of Technology (131 pages). Prepared for USDOE Office of Energy Efficiency and Renewable Energy, Geothermal Technologies Office under Contract no. EE0002743, Recovery Act – Decision Aids for Geothermal Systems, May 2014. doi:10.2172/1236455
Link
Oglesby, K., Woskov, P., Einstein, H.H., and Livesay, B. (2014). Deep Geothermal Drilling Using Millimeter Wave Technology. Final technical research report, 30 September 2011 – 30 September 2014, Massachusetts Institute of Technology. Prepared for USDOE Office of Energy Efficiency and Renewable Energy, Geothermal Technologies Office under Contract no. EE0005504, December 2014. doi:10.2172/1169951
Link
Moret, Y., and Einstein, H.H. (2011). Cost and time correlations in linear infrastructure construction. In M.H. Faber, J. Köhler & K. Nishijima (eds): Proceedings of the 11th International Conference on Applications of Statistics and Probability in Civil Engineering, ICASP11, 1-4 August 2011, Zurich, Switzerland, pp. 788-796. CRC Press: Boca Raton, FL. ISBN 978-0203144794 (eBook)
Link
Costa, A.L., Coelho, P., Cunha, M., and Einstein, H.H. (2010). Tools for high-speed rail planning optimization: preliminary developments of a case study. In: General Proceedings of the 12th World Conference on Transport Research, 11-15 July 2010, Instituto Superior Técnico, Lisboa, Portugal. Leeds: World Conference on Transport Research Society. ISBN 978-9899698604
Link
Einstein, H.H. (2009). The Decision Aids for Tunneling – Recent applications and development. Special lecture. In L. Lamas, A.G. Correia, T.F.S. Miranda, R. Resende & B. Figueiredo (eds): Proceedings of Seminário Aspectos Geotécnicos do Projecto, Construção, Exploração e Análise de Risco em Obras Subterrâneas | Livro de Atas, 10-11 December 2009, Lisbon, Portugal. Lisbon: Sociedade Portuguesa de Geotecnia.
Link
Moret, Y., Sousa, R., and Einstein, H.H. (2009). The Decision Aids for Tunneling – Introduction and recent applications in Portugal. In R. Delgado, A. Campos e Matos, R. Calçada, L. Ribeiro e Sousa & A. Topa Gomes (Eds): Proceedings of the Tunnels for High-Speed Railways Workshop, 1-2 October 2009, Porto, Portugal. Porto: FEUP. ISBN 978-9727521128
