Category: Underground Construction

Link

Schwartz, C.W., Azzouz, A.S., and Einstein, H.H. (1979). Analysis of Yielding in Ground-Structure Interaction. Massachusetts Institute of Technology, Department of Civil Engineering. Improved Design of Tunnel Supports: Volume 2. MIT report no. R79-28, 78 pages, 1979. Prepared for U.S. Department of Transportation, Transportation Systems Center, Cambridge, MA, under Contract no. DOT-TSC-1489. MIT Libraries: 000075803

Link

Schwartz, C.W., and Einstein, H.H. (1979). Simplified Analysis for Ground-Structure Interaction in Tunneling. Massachusetts Institute of Technology, Department of Civil Engineering. Improved Design of Tunnel Supports: Volume 1. MIT report no. R79-27, 443 pages, 1979. Prepared for U.S. Department of Transportation, Transportation Systems Center, Cambridge, MA, under Contract no. DOT-TSC-1489. MIT Libraries: 000075890

Link

Schwartz, C.W., Einstein, H.H., Azzouz, A.S., and Steiner, W. (1980). Improved Design of Tunnel Supports: Final Report. Massachusetts Institute of Technology, Department of Civil Engineering. Prepared for U.S. Department of Transportation, Urban Mass Transportation Administration, Office of Rail and Construction Technology, Transportation Systems Center, under Contract no. DOT-TSC-1489. Report no. DOT-OS-60136, DOT/RSPA/DPB-50-79/10, May 1980. MIT Libraries: 000122455

Link

Einstein, H.H., and Testoni, P. (1998). Swiss Trans-Alpine Tunnel Projects. In U.W. Kitzinger and E.G. Frankel (eds.): Macro-Engineering and the Earth: World Projects for Year 2000 and Beyond, Chapter 13, 147–162. Woodhead Publishing Limited, 1998. ISBN: 978-1898563594 https://doi.org/10.1016/B978-1-898563-59-4.50021-0

Link

Einstein, H.H., Labreche, D.A., Markow, M.J., and Baecher, G.B. (1978). Decision analysis applied to rock tunnel exploration. Engineering Geology, 12, 143-161. doi:10.1016/0013-7952(78)90008-X

Link

Sinfield, J., and Einstein, H.H. (1996). Evaluation of tunneling technology using the Decision Aids for Tunneling. Tunnelling and Underground Space Technology, 11(4), 491–504. doi:10.1016/S0886-7798(96)89245-5

Link

Suwansawat, S., and Einstein, H.H. (2006). Artificial neural networks for predicting the maximum surface settlement caused by EPB shield tunneling. Tunnelling and Underground Space Technology, 21 (2), 133–150. doi:10.1016/j.tust.2005.06.007

Link

Sousa, R.L., and Einstein, H.H. (2012). Risk analysis during tunnel construction using Bayesian networks: Porto Metro case study. Tunnelling and Underground Space Technology, 27 (1), 86-100. doi:10.1016/j.tust.2011.07.003

Link

Low, B.K., and Einstein, H.H. (2013). Reliability analysis of roof wedges and rockbolt forces in tunnels. Tunnelling and Underground Space Technology, 38, 1-10. doi:10.1016/j.tust.2013.04.006

Link

Yost, K., Valentin, A., and Einstein, H.H. (2015). Estimating cost and time of wellbore drilling for Engineered Geothermal Systems (EGS) – Considering uncertainties. Geothermics, 53, 11-19. doi:10.1016/j.geothermics.2014.04.005