Moret, Y., and Einstein, H.H. (2012). Experience in expert estimation of probabilities and correlations for rail line construction (Technical Note). Construction Engineering and Management, 138 (9), 1103-1106. doi:10.1061/(ASCE)CO.1943-7862.0000505
Tag: risk UC
Link
Moret, Y., and Einstein, H.H. (2012). Modeling correlations in rail line construction. Construction Engineering and Management, 138 (9), 1075-1084. doi:10.1061/(ASCE)CO.1943-7862.0000507
Link
Costa, A.L., da Conceição Cunha, M., Coelho, P.A.L.F., and Einstein, H.H. (2013). Solving high-speed rail planning with the simulated annealing algorithm. Transportation Engineering, 139 (6), 635-642. doi:10.1061/(ASCE)TE.1943-5436.0000542
Link
Einstein, H.H. (1996). Risk and risk analysis in rock engineering. Tunnelling and Underground Space Technology, 11 (2), 141-155. doi:10.1016/0886-7798(96)00014-4
Link
Duzgun, H.S.B., and Einstein, H.H. (2004). Assessment and management of roof fall risks in underground coal mines. Safety Science, 42 (1), 23-41. doi:10.1016/S0925-7535(02)00067-X
Link
Sousa, R.L., and Einstein, H.H. (2012). Risk analysis during tunnel construction using Bayesian networks: Porto Metro case study. Tunnelling and Underground Space Technology, 27 (1), 86-100. doi:10.1016/j.tust.2011.07.003
Link
Sousa, R., and Einstein, H.H. (2007). Risk analysis for tunnelling projects using Bayesian networks. In: Proceedings of the 11th ISRM Congress, 9-13 July, Lisbon, Portugal, pp. 1301-1304. ISRM-11CONGRESS-2007-282
Link
Einstein, H.H. (2008). Reducing uncertainty through updating – from experiments to the observational method. In: Proceedings of the 11th ISRM Congress, 9-13 July, Lisbon, Portugal. ISRM-11CONGRESS-2007-294
